Boomilever

Built before the tournament: a cantilevered beam or truss that reaches out from a vertical testing wall and holds a load at a set height and distance. Scores reward structural efficiency, with a bonus for the load held.

  • Build event
  • Teams of up to 2
  • About 10 minutes
  • Division C · 2027 rules

Boomilever is being written now. Make a free account and it will be waiting when it opens.

What the 2027 rules cover

The device, how it's run and how it's scored, in brief. Topics marked State & national are left out at regionals.

  • Build a wooden cantilevered beam or truss out from a vertical wall to hold a load at a set height and distance; scored on structural efficiency plus a bonus. Teams of up to 2, about 10 minutes, eye protection B, no impound.
  • Event parameters

    • One structure per team.
    • Eye protection B (Z87+ marked) must be worn.
    • Design knowledge: answer questions about how the structure was built and how it works
    • At in-person tournaments the supervisor supplies the test apparatus; teams may not measure or adjust it or bring tools or instruments.
  • Construction parameters

    • One single structure with no separate, loose or detachable parts
    • Only wood bonded with adhesive; no other materials
    • Attaches to the wall only by resting on the Mounting Bolt Assembly
    • Supports only the Loading Block, which carries the rest of the Loading Assembly
    • Chain centerline 40–45 cm out from the wall and within 2.5 cm either side of the wall's centerline
    • May touch only the wall's face outside the vertical Contact Width Lines; never its sides, top or bottom
    • Before sand is loaded, the Loading Block's bottom sits above the horizontal plane through the bolt's centerline
    • Base option: wall contact only above the 15 cm contact depth line, otherwise Tier 2
    • Bonus option: wall contact only above the 10 cm line and the structure holds 15 kg
  • Competition

    • Before competition the supervisor checks the apparatus and that the Loading Assembly plus sand is 15,100–15,200 g.
    • Check-in: no outside help or changes to the structure, inspection, estimated load submitted, structure massed to 0.01 g
    • Testing
      • 6 minutes to set up and test; Loading Assembly reassembled in order; bucket hung with floor clearance
      • Before loading, the supervisor checks the construction requirements and the bonus requirements and bucket clearance.
      • No adjusting the structure once sand loading begins.
      • Teams load the sand; the bucket may be steadied only with the tips of the stabilizing sticks, never lifted or pushed
      • Loading stops at failure, when anything else carries the load, on other vertical support, or when time runs out
      • Load Supported: Loading Assembly plus sand, to the nearest gram, with any fallen structure pieces removed
      • Minimum load is the Loading Assembly; a structure that can't hold it scores participation only
      • Maximum Load Supported is 15,000 g
      • The supervisor reviews the recorded data with the team; acknowledging it ends testing.
      • Teams appealing must leave their structure with the supervisor.
  • Scoring

    • High score wins: score = Load Scored / structure mass
    • Load Scored Bonus of 7,500 g for meeting the bonus construction option
    • Load Scored = Load Supported + Load Scored Bonus
    • Tier 1 meets every requirement, Tier 2 misses one or more, and some failures score participation only
    • Tiebreakers: lowest structure mass, then the estimated load closest to the actual load
  • Test apparatus

    • The supervisor provides the apparatus in person (more than one may be used); at satellite tournaments the coach or a designee does.
    • The Testing Wall
      • A rigid, smooth, low-friction wall at least 40.0 cm wide by 30.0 cm high, set plumb
      • One mounting bolt hole about 5.0 cm below the top, centered side to side, with its centerlines marked
      • Horizontal contact depth lines 10, 15 and 20 cm below the bolt hole's center
      • Vertical contact width lines 4.0 cm left and right of the bolt hole's center
      • Mounting Bolt Assembly: 1/4-20 connector bolt with nuts and washers, 3.0 cm clear of the wall face; teams may not adjust it
    • Loading Assembly: 5 cm square Loading Block on an eyebolt with wing nut, chain, S-hook and bucket, at most 1,500 g
    • The load is applied with sand.
    • Two bucket stabilizing sticks: dowels with a spring doorstop on one end.
    • Structure scale: digital recommended, 0.01 g resolution recommended, 0.1 g minimum.
    • Sand scale: digital recommended, about 1 g resolution recommended, 10 g minimum.
    • A countdown timer that can be set to 6 minutes is recommended.
  • Definitions

    • What counts as wood (no bark, composites, bamboo, paper or plywood) and how it may not be treated (painted, soaked, coated, modified)
    • No limits on the cross-section size of wood pieces
    • Teams may laminate wood themselves; commercially laminated wood is not allowed
    • Any commercial adhesive, used only to join parts; no adhesive tape
    • Where to buy the connector bolt and its finishes.
    • Sand means a clean, dry, free-flowing material like play sand or steel shot.

Paraphrased by SciPrep from the 2027 Science Olympiad Division C Rules Manual, pages C7–C12. The official rules are in the Rules Manual from Science Olympiad; when they differ, the manual and its clarifications win.